Branch Wise MCQBuilding MaterialsCivil Engineering Mcqs

100+ MCQ & Answer Building Materials | page-04 |Civil Engineering MCQ And Answer

31.
The _______ arrangement of preventing the slip of earth in the foundation trenches is adopted when a large area is to be excavated for depth greater than 10 meters.

32.
In _______ arrangement, the vertical sheets are placed nearer or sometimes, touching each other.

33.
The _______ method is similar to box sheeting except that the work is carried out in stages and at each stage, and offset is provided.

34.
Which the given method is used for dewatering of the foundation trenches.

35.
Which precautions to be taken in case of multistage system to achieve stability of the side slope?

36.
The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches.

37.
Identify the type of Well Point System which can suck water up to 5 meters?

38.
In which method a refrigeration plant of required capacity is needed to be installed near the site of work?

39.
______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure.

40.
The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches?

Leave a Reply

Your email address will not be published. Required fields are marked *