Branch Wise MCQBuilding MaterialsCivil Engineering Mcqs 100+ MCQ & Answer Building Materials | page-04 |Civil Engineering MCQ And Answer January 26, 2025 DSN MARATHI 31. The _______ arrangement of preventing the slip of earth in the foundation trenches is adopted when a large area is to be excavated for depth greater than 10 meters. A. Sheet piling B. Runner C. Box sheeting D. Stay bracing Answer Option : A 32. In _______ arrangement, the vertical sheets are placed nearer or sometimes, touching each other. A. Stay bracing B. Box sheeting C. Vertical sheeting D. Runner Answer Option : B 33. The _______ method is similar to box sheeting except that the work is carried out in stages and at each stage, and offset is provided. A. Sheet piling B. Box sheeting C. Stay bracing D. Vertical sheeting Answer Option : D 34. Which the given method is used for dewatering of the foundation trenches. A. Deep boring B. Geophysical method C. Well Point System D. Analytical method Answer Option : C 35. Which precautions to be taken in case of multistage system to achieve stability of the side slope? A. Deep well pumps B. Duplication of pumps C. Connections D. Pumping Answer Option : A 36. The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches. A. Well Point System B. Cement grouting C. Chemical grouting D. Electro osmosis process Answer Option : A 37. Identify the type of Well Point System which can suck water up to 5 meters? A. Single stage system B. Multi stage system C. Vacuum system D. Pumping Answer Option : A 38. In which method a refrigeration plant of required capacity is needed to be installed near the site of work? A. Pumping B. Well Point System C. Freezing process D. Electro osmosis process Answer Option : C 39. ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure. A. Chemical grouting B. Cement grouting C. Freezing process D. Electro osmosis process Answer Option : B 40. The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches? A. Well Point System B. Cement grouting C. Chemical grouting D. Electro osmosis process Answer Option : C
31. The _______ arrangement of preventing the slip of earth in the foundation trenches is adopted when a large area is to be excavated for depth greater than 10 meters. A. Sheet piling B. Runner C. Box sheeting D. Stay bracing Answer Option : A
32. In _______ arrangement, the vertical sheets are placed nearer or sometimes, touching each other. A. Stay bracing B. Box sheeting C. Vertical sheeting D. Runner Answer Option : B
33. The _______ method is similar to box sheeting except that the work is carried out in stages and at each stage, and offset is provided. A. Sheet piling B. Box sheeting C. Stay bracing D. Vertical sheeting Answer Option : D
34. Which the given method is used for dewatering of the foundation trenches. A. Deep boring B. Geophysical method C. Well Point System D. Analytical method Answer Option : C
35. Which precautions to be taken in case of multistage system to achieve stability of the side slope? A. Deep well pumps B. Duplication of pumps C. Connections D. Pumping Answer Option : A
36. The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches. A. Well Point System B. Cement grouting C. Chemical grouting D. Electro osmosis process Answer Option : A
37. Identify the type of Well Point System which can suck water up to 5 meters? A. Single stage system B. Multi stage system C. Vacuum system D. Pumping Answer Option : A
38. In which method a refrigeration plant of required capacity is needed to be installed near the site of work? A. Pumping B. Well Point System C. Freezing process D. Electro osmosis process Answer Option : C
39. ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure. A. Chemical grouting B. Cement grouting C. Freezing process D. Electro osmosis process Answer Option : B
40. The organic Chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches? A. Well Point System B. Cement grouting C. Chemical grouting D. Electro osmosis process Answer Option : C